|
|
|
|
LEADER |
03458nam a22004695i 4500 |
001 |
978-1-4471-4561-5 |
003 |
DE-He213 |
005 |
20151204182023.0 |
007 |
cr nn 008mamaa |
008 |
121026s2013 xxk| s |||| 0|eng d |
020 |
|
|
|a 9781447145615
|9 978-1-4471-4561-5
|
024 |
7 |
|
|a 10.1007/978-1-4471-4561-5
|2 doi
|
040 |
|
|
|d GrThAP
|
050 |
|
4 |
|a TA177.4-185
|
072 |
|
7 |
|a TBC
|2 bicssc
|
072 |
|
7 |
|a KJMV
|2 bicssc
|
072 |
|
7 |
|a TEC000000
|2 bisacsh
|
082 |
0 |
4 |
|a 658.5
|2 23
|
100 |
1 |
|
|a Suwa, Haruhiko.
|e author.
|
245 |
1 |
0 |
|a Online Scheduling in Manufacturing
|h [electronic resource] :
|b A Cumulative Delay Approach /
|c by Haruhiko Suwa, Hiroaki Sandoh.
|
264 |
|
1 |
|a London :
|b Springer London :
|b Imprint: Springer,
|c 2013.
|
300 |
|
|
|a X, 158 p.
|b online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
347 |
|
|
|a text file
|b PDF
|2 rda
|
505 |
0 |
|
|a Scheduling Strategies Coping with Uncertainty -- When-to-Schedule Policy Using Cumulative Delay -- Cumulative Delay Based Periodic Rescheduling -- Cumulative Delay Based Reactive Scheduling -- Hybrid When-to-Schedule Policies with Cumulative Delay -- Discussions -- Conclusions.
|
520 |
|
|
|a Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the practical decision-making: 1. To reduce frequent schedule revisions which do not necessarily improve a current situation with much expense for its operation; 2. To avoid overreacting to disturbances dependent on strongly an individual shop floor circumstance; and 3. To simplify the monitoring process of a schedule status. Online Scheduling in Manufacturing will be of interest to both practitioners and researchers who work in planning and scheduling in manufacturing. Readers will find the importance of when-to-revise policies during a schedule execution and their influences on scheduling results.
|
650 |
|
0 |
|a Engineering.
|
650 |
|
0 |
|a Production management.
|
650 |
|
0 |
|a Engineering economics.
|
650 |
|
0 |
|a Engineering economy.
|
650 |
1 |
4 |
|a Engineering.
|
650 |
2 |
4 |
|a Engineering Economics, Organization, Logistics, Marketing.
|
650 |
2 |
4 |
|a Operations Management.
|
700 |
1 |
|
|a Sandoh, Hiroaki.
|e author.
|
710 |
2 |
|
|a SpringerLink (Online service)
|
773 |
0 |
|
|t Springer eBooks
|
776 |
0 |
8 |
|i Printed edition:
|z 9781447145608
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1007/978-1-4471-4561-5
|z Full Text via HEAL-Link
|
912 |
|
|
|a ZDB-2-ENG
|
950 |
|
|
|a Engineering (Springer-11647)
|