|
|
|
|
LEADER |
03719nam a22004935i 4500 |
001 |
978-1-4471-4576-9 |
003 |
DE-He213 |
005 |
20151204181154.0 |
007 |
cr nn 008mamaa |
008 |
121026s2013 xxk| s |||| 0|eng d |
020 |
|
|
|a 9781447145769
|9 978-1-4471-4576-9
|
024 |
7 |
|
|a 10.1007/978-1-4471-4576-9
|2 doi
|
040 |
|
|
|d GrThAP
|
050 |
|
4 |
|a TA177.4-185
|
072 |
|
7 |
|a TBC
|2 bicssc
|
072 |
|
7 |
|a KJMV
|2 bicssc
|
072 |
|
7 |
|a TEC000000
|2 bisacsh
|
082 |
0 |
4 |
|a 658.5
|2 23
|
100 |
1 |
|
|a Kang, Shu Gang.
|e author.
|
245 |
1 |
0 |
|a Multi-Agent Based Beam Search for Real-Time Production Scheduling and Control
|h [electronic resource] :
|b Method, Software and Industrial Application /
|c by Shu Gang Kang, Shiu Hong Choi.
|
264 |
|
1 |
|a London :
|b Springer London :
|b Imprint: Springer,
|c 2013.
|
300 |
|
|
|a X, 134 p.
|b online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
347 |
|
|
|a text file
|b PDF
|2 rda
|
505 |
0 |
|
|a 1.Introduction -- 2.Literature Review -- 3.Research Methodology -- 4.The Multi-Stage Multi-Level Decision-Making Model -- 5.Knowledge-Directed opportunistic Search -- 6. The Multi-Agent Based Beam Search Method -- 7. Modeling Complex Decision-Making Problems with the MABBS Methods -- 8.The MABBS Engine -- 9.Industrial Application of the MABBS Method -- 10.Summary and Directions for Future Research.
|
520 |
|
|
|a The Multi-Agent Based Beam Search (MABBS) method systematically integrates four major requirements of manufacturing production - representation capability, solution quality, computation efficiency, and implementation difficulty - within a unified framework to deal with the many challenges of complex real-world production planning and scheduling problems. Multi-agent Based Beam Search for Real-time Production Scheduling and Control introduces this method, together with its software implementation and industrial applications. This book connects academic research with industrial practice, and develops a practical solution to production planning and scheduling problems. To simplify implementation, a reusable software platform is developed to build the MABBS method into a generic computation engine. This engine is integrated with a script language, called the Embedded Extensible Application Script Language (EXASL), to provide a flexible and straightforward approach to representing complex real-world problems. Adopting an in-depth yet engaging and clear approach, and avoiding confusing or complicated mathematics and formulas, this book presents simple heuristics and a user-friendly software platform for system modelling. The supporting industrial case studies provide key information for students, lecturers, and industry practitioners alike. Multi-agent Based Beam Search for Real-time Production Scheduling and Control offers insights into the complex nature of and a practical total solution to production planning and scheduling, and inspires further research and practice in this promising research area.
|
650 |
|
0 |
|a Engineering.
|
650 |
|
0 |
|a Production management.
|
650 |
|
0 |
|a Computer simulation.
|
650 |
|
0 |
|a Engineering economics.
|
650 |
|
0 |
|a Engineering economy.
|
650 |
1 |
4 |
|a Engineering.
|
650 |
2 |
4 |
|a Engineering Economics, Organization, Logistics, Marketing.
|
650 |
2 |
4 |
|a Operations Management.
|
650 |
2 |
4 |
|a Simulation and Modeling.
|
700 |
1 |
|
|a Choi, Shiu Hong.
|e author.
|
710 |
2 |
|
|a SpringerLink (Online service)
|
773 |
0 |
|
|t Springer eBooks
|
776 |
0 |
8 |
|i Printed edition:
|z 9781447145752
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1007/978-1-4471-4576-9
|z Full Text via HEAL-Link
|
912 |
|
|
|a ZDB-2-ENG
|
950 |
|
|
|a Engineering (Springer-11647)
|