Capacitated Lot Sizing Problems in Process Industries

This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of...

Πλήρης περιγραφή

Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριοι συγγραφείς: Ramya, Ravi (Συγγραφέας, http://id.loc.gov/vocabulary/relators/aut), Rajendran, Chandrasekharan (http://id.loc.gov/vocabulary/relators/aut), Ziegler, Hans (http://id.loc.gov/vocabulary/relators/aut), Mohapatra, Sanjay (http://id.loc.gov/vocabulary/relators/aut), Ganesh, K. (http://id.loc.gov/vocabulary/relators/aut)
Συγγραφή απο Οργανισμό/Αρχή: SpringerLink (Online service)
Μορφή: Ηλεκτρονική πηγή Ηλ. βιβλίο
Γλώσσα:English
Έκδοση: Cham : Springer International Publishing : Imprint: Springer, 2019.
Έκδοση:1st ed. 2019.
Θέματα:
Διαθέσιμο Online:Full Text via HEAL-Link
LEADER 05571nam a2200541 4500
001 978-3-030-01222-9
003 DE-He213
005 20191023112420.0
007 cr nn 008mamaa
008 190104s2019 gw | s |||| 0|eng d
020 |a 9783030012229  |9 978-3-030-01222-9 
024 7 |a 10.1007/978-3-030-01222-9  |2 doi 
040 |d GrThAP 
050 4 |a TS155-194 
072 7 |a KJMV5  |2 bicssc 
072 7 |a BUS087000  |2 bisacsh 
072 7 |a KJMV5  |2 thema 
082 0 4 |a 658.5  |2 23 
100 1 |a Ramya, Ravi.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
245 1 0 |a Capacitated Lot Sizing Problems in Process Industries  |h [electronic resource] /  |c by Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra, K. Ganesh. 
250 |a 1st ed. 2019. 
264 1 |a Cham :  |b Springer International Publishing :  |b Imprint: Springer,  |c 2019. 
300 |a XXXV, 196 p. 41 illus.  |b online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
347 |a text file  |b PDF  |2 rda 
505 0 |a Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments. 
520 |a This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries. 
650 0 |a Production management. 
650 0 |a Industrial engineering. 
650 0 |a Production engineering. 
650 0 |a Operations research. 
650 0 |a Decision making. 
650 1 4 |a Production.  |0 http://scigraph.springernature.com/things/product-market-codes/519010 
650 2 4 |a Industrial and Production Engineering.  |0 http://scigraph.springernature.com/things/product-market-codes/T22008 
650 2 4 |a Operations Research/Decision Theory.  |0 http://scigraph.springernature.com/things/product-market-codes/521000 
700 1 |a Rajendran, Chandrasekharan.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
700 1 |a Ziegler, Hans.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
700 1 |a Mohapatra, Sanjay.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
700 1 |a Ganesh, K.  |e author.  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
710 2 |a SpringerLink (Online service) 
773 0 |t Springer eBooks 
776 0 8 |i Printed edition:  |z 9783030012212 
776 0 8 |i Printed edition:  |z 9783030012236 
856 4 0 |u https://doi.org/10.1007/978-3-030-01222-9  |z Full Text via HEAL-Link 
912 |a ZDB-2-BUM 
950 |a Business and Management (Springer-41169)