LEADER |
03868nam a22005295i 4500 |
001 |
978-88-470-5244-4 |
003 |
DE-He213 |
005 |
20151103130016.0 |
007 |
cr nn 008mamaa |
008 |
130525s2013 it | s |||| 0|eng d |
020 |
|
|
|a 9788847052444
|9 978-88-470-5244-4
|
024 |
7 |
|
|a 10.1007/978-88-470-5244-4
|2 doi
|
040 |
|
|
|d GrThAP
|
050 |
|
4 |
|a TA169.7
|
050 |
|
4 |
|a T55-T55.3
|
050 |
|
4 |
|a TA403.6
|
072 |
|
7 |
|a TGPR
|2 bicssc
|
072 |
|
7 |
|a TEC032000
|2 bisacsh
|
082 |
0 |
4 |
|a 658.56
|2 23
|
100 |
1 |
|
|a Caron, Franco.
|e author.
|
245 |
1 |
0 |
|a Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects
|h [electronic resource] /
|c by Franco Caron.
|
264 |
|
1 |
|a Milano :
|b Springer Milan :
|b Imprint: Springer,
|c 2013.
|
300 |
|
|
|a VIII, 88 p. 13 illus.
|b online resource.
|
336 |
|
|
|a text
|b txt
|2 rdacontent
|
337 |
|
|
|a computer
|b c
|2 rdamedia
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier
|
347 |
|
|
|a text file
|b PDF
|2 rda
|
490 |
1 |
|
|a SpringerBriefs in Applied Sciences and Technology,
|x 2191-530X
|
505 |
0 |
|
|a Introduction -- Large Engineering Projects Strategy -- Large Engineering Projects - the Oil and Gas Case -- Project Management -- Improving the Forecasting Process in Project Control -- Robustness and Flexibility -- Project Risk Analysis and Management -- Real Options -- Stakeholders as Uncertainty Sources -- Project Organizational Model -- Introduction to Project Risk -- Project Risk Analysis -- Project Risk Management -- Quantitative Analysis of Project Risks -- Conclusions.
|
520 |
|
|
|a The brief will describe how to develop a risk analysis applied to a project , through a sequence of steps: risk management planning, risk identification, risk classification, risk assessment, risk quantification, risk response planning, risk monitoring and control, process close out and lessons learning. The project risk analysis and management process will be applied to large engineering projects, in particular related to the oil and gas industry. The brief will address the overall range of possible events affecting the project moving from certainty (project issues) through uncertainty (project risks) to unpredictability (unforeseeable events), considering both negative and positive events. Some quantitative techniques (simulation, event tree, Bayesian inference, etc.) will be used to develop risk quantification. The brief addresses a typical subject in the area of project management, with reference to large engineering projects concerning the realization of large plants and infrastructures. These projects are characterized by a high level of change, uncertainty, complexity and ambiguity. The brief represents an extension of the material developed for the course Project Risk Analysis and Management of the Master in Strategic Project Management (Erasmus Mundus) developed jointly by Politecnico di Milano, Heriot Watt University (Edimburgh) and Umea (Sweden). The brief may be used both in courses addressing project management subjects and by practitioners as a guide for developing an effective project risk management plan.
|
650 |
|
0 |
|a Engineering.
|
650 |
|
0 |
|a Project management.
|
650 |
|
0 |
|a Statistics.
|
650 |
|
0 |
|a Quality control.
|
650 |
|
0 |
|a Reliability.
|
650 |
|
0 |
|a Industrial safety.
|
650 |
1 |
4 |
|a Engineering.
|
650 |
2 |
4 |
|a Quality Control, Reliability, Safety and Risk.
|
650 |
2 |
4 |
|a Project Management.
|
650 |
2 |
4 |
|a Statistics for Engineering, Physics, Computer Science, Chemistry and Earth Sciences.
|
710 |
2 |
|
|a SpringerLink (Online service)
|
773 |
0 |
|
|t Springer eBooks
|
776 |
0 |
8 |
|i Printed edition:
|z 9788847052437
|
830 |
|
0 |
|a SpringerBriefs in Applied Sciences and Technology,
|x 2191-530X
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1007/978-88-470-5244-4
|z Full Text via HEAL-Link
|
912 |
|
|
|a ZDB-2-ENG
|
950 |
|
|
|a Engineering (Springer-11647)
|