Building contract claims.
Many building projects are the subject of claims - the assertion of a right, usually by the contractor, to an extension of the contract period or an additional payment under the terms of the building contract. Many of these claims are unsound or ill-founded, often because the basic principles are mi...
Main Author: | Chappell, David |
---|---|
Corporate Author: | Wiley InterScience (Online service) |
Format: | eBook |
Language: | English |
Published: |
Oxford :
Wiley-Blackwell,
2011.
|
Edition: | 5th ed. / |
Subjects: | |
Online Access: | Full Text via HEAL-Link |
Similar Items
-
Practical guide to the NEC3 Engineering and Construction Contract /
by: Rowlinson, Michael
Published: (2016) -
A Practical Guide to the NEC3 Engineering and Construction Contract /
by: Rowlinson, Michael
Published: (2011) -
The JCT standard building contract 2011 : (an explanation and guide for busy practitioners and students) /
by: Chappell, David (David M.)
Published: (2014) -
The JCT 2011 building sub-contracts /
by: Barnes, Peter, 1954-, et al.
Published: (2015) -
A practical guide to construction adjudication /
by: Pickavance, James
Published: (2016)