Delay analysis in construction contracts /

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct resul...

Full description

Bibliographic Details
Main Author: Keane, P. J. (P. John)
Other Authors: Caletka, A. F. (Anthony F.)
Format: eBook
Language:English
Published: Chichester, West Sussex, United Kingdom ; Hoboken, NJ : Wiley Blackwell, 2015.
Edition:2nd edition.
Subjects:
Online Access:Full Text via HEAL-Link
LEADER 05438nam a2200673 4500
001 ocn904507204
003 OCoLC
005 20171016015913.0
006 m o d
007 cr |||||||||||
008 150305s2015 enk ob 001 0 eng
010 |a  2015009217 
040 |a DLC  |b eng  |e rda  |c DLC  |d DG1  |d N$T  |d OCLCF  |d RECBK  |d YDXCP  |d EBLCP  |d OCLCQ  |d CQ$  |d DEBBG  |d DG1  |d LIP  |d GrThAP 
019 |a 910670572 
020 |a 9781118631133 (epub) 
020 |a 1118631137 (epub) 
020 |a 9781118631126 (pdf) 
020 |a 1118631129 (pdf) 
020 |z 9781118631171 (cloth : alk. paper) 
020 |a 9781118631102 
020 |a 1118631102 
028 0 1 |a EB00611002  |b Recorded Books 
029 1 |a DEBBG  |b BV043397594 
029 1 |a CHVBK  |b 480243115 
029 1 |a CHNEW  |b 000944081 
029 1 |a DEBSZ  |b 485056445 
029 1 |a CHVBK  |b 48091611X 
029 1 |a CHBIS  |b 010879746 
035 |a (OCoLC)904507204  |z (OCoLC)910670572 
042 |a pcc 
050 0 0 |a HD9715.A2 
072 7 |a TEC  |x 005000  |2 bisacsh 
082 0 0 |a 690.068/5  |2 23 
049 |a MAIN 
100 1 |a Keane, P. J.  |q (P. John) 
245 1 0 |a Delay analysis in construction contracts /  |c P.J. Keane & A.F. Caletka. 
250 |a 2nd edition. 
264 1 |a Chichester, West Sussex, United Kingdom ;  |a Hoboken, NJ :  |b Wiley Blackwell,  |c 2015. 
300 |a 1 online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b n  |2 rdamedia 
338 |a online resource  |b nc  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
588 |a Description based on print version record and CIP data provided by publisher. 
520 |a The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.This book is a practical guide to the process of delay analysis and includes an in-depth review of the priMary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international.The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including 'who owns the float', concurrent delay, early completion programmes, and disruption. The book has been brought fully up to date, including references to the latest publications from the CIOB, AACEI and SCL, as well as current case law. Broad in scope, the book discusses the different delay analysis approaches likely to be encountered on national and international projects, and features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners.This is an invaluable resource to programmers and schedulers, delay analysts, contractors, architects, engineers and surveyors. It will also be of interest to clients' professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based.Reviews of First Edition"John Keane and Anthony Caletka are pukka analysts in that tricky area of delays, programming and extension of time. I highly recommend their book Delay Analysis in Construction Contracts. Buy the book." (Building Magazine, February 2009)"The book's stated purpose is to provide a practical guide for those interested in schedule delay analysis. It provides a good in'depth review of the most common delay analysis techniques... An excellent book, full of practical tips for the reader and very timely in its publication. It is well worth the cost and a good read for anyone involved in schedule delay analysis." (Cost Engineering, February 2009)It achieves in spades its stated aim of being a practical guide for contractors, contract administrators, programmers and delay analysts, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. (Construction Law Journal, 2009). 
650 0 |a Construction industry  |x Cost control. 
650 0 |a Construction industry  |x Planning. 
650 0 |a Production scheduling. 
650 0 |a Construction contracts. 
650 7 |a TECHNOLOGY & ENGINEERING / Construction / General  |2 bisacsh 
650 7 |a Construction contracts.  |2 fast  |0 (OCoLC)fst00875896 
650 7 |a Construction industry  |x Cost control.  |2 fast  |0 (OCoLC)fst00875987 
650 7 |a Construction industry  |x Planning.  |2 fast  |0 (OCoLC)fst00876097 
650 7 |a Production scheduling.  |2 fast  |0 (OCoLC)fst01078354 
655 4 |a Electronic books. 
700 1 |a Caletka, A. F.  |q (Anthony F.) 
776 0 8 |i Print version:  |a Keane, P. J. (P. John)  |t Delay analysis in construction contracts  |b 2nd edition.  |d Chichester, West Sussex, United Kingdom ; Hoboken, NJ : John Wiley and Sons, Inc., 2015  |z 9781118631171  |w (DLC) 2015008907 
856 4 0 |u https://doi.org/10.1002/9781118631102  |z Full Text via HEAL-Link 
994 |a 92  |b DG1